Search Content
Memorandum for the Director, Geological Survey
Letters about the printing price and the request of reservation maps.
Letter from Acting Chief to Forestry Director
Letter explaining for a delay in shipping out a map for the Forestry Department.
Letter from Commissioner to SCS Director
Letter stating the southern boundary of the reservation is not completed/included, and they request the maps are updated or the missing maps are mailed out.
Letter to SCS: Forestry and Grazing
Letter stating the Forestry Dep should not be required to pay for more aerial surveying because the SCS was supposed to survey the entire Fort Apache reserve.
Letter from Forestry Director to Superintendent
Letter stating the Fort Apache map has not been completed because the department is missing the southern area, and they ask the recipient to check for errors and the map and correct them.
Letter from Agriculture Chief to Dep of Interior
Extension map of Fort Apache with an explanation of the survey, landscape, and map features.
Letter from Superintendent to IA Commissioner
Letter stating there are several errors with the maps sent to the Department of IA. Errors are listed.
Letter from Acting Director of Forestry to Superintendent
Memo stating the department requires thorough aerial maps of Fort Apache, and the ones issued to the department need to be corrected.
Letter from Superintendent to IA Commissioner
The accuracy of the Fort Apache aerial maps need to be improved. Letter states what needs to be corrected.
Letter re: insufficient field on aerial maps
The large scale used on the new aerial maps prevents them from being used by fire controllers due to the lack of space on the maps. As such the department is requesting a correction or they'll have to continue using the older aerial maps. Response attached: Forestry Directory writes they will not be able to update maps by the fire season.
Letter re: Hilltop on the San Carols
Letter explaining the issues the surveyors had with replotting the maps at San Carlos.
Letter re: Hilltop and WPA allotment
Letter explaining the discrepancies seen in the aerial maps due to triangulation. WPA allotment also discussed.
Letter re: Telephone wires, roads, and trails on aerial maps
Letter requesting the lines indicating the telephone wires on the aerial maps be a different colour and design in order to distinguish them from road and trail lines. A response letter stating the corrections have been made is attached.
Letter re: Fort Apache maps photolithographed and printed in black
Letter requesting aerial maps be printed. Amount, copy type, scale, and cost is indicated.
Letter re: mail ten prints ft apache
Telegram requesting ten copies of the aerial maps be mailed out. Response letter attached stating 100 copies were recently sent out.